I & I Projects

Previously Funded Areas

FY08 - Engineering, Design & Construction (Various Locations)

  • Infiltration Construction - Area 2, 24 & 21(L)
  • Area 22(Prelim. Design - Infiltration)

FY09 and FY10 No funding requested

FY11 - Area 16 and 22 Started

FY12 - Area 16 - Area 22 - Construction (continuation)

FY13 – Phase I I/I Feasibility Study and Cost Benefit Analysis

FY 14 – Phase II I/I Townwide System Master Plan

Proposed Funded Areas

FY 15 – FY17 Area Determined by Study