Needham Massachusetts Homepage
Search
When do I need to obtain a Sheet Metal Permit?
When any provision under 780 CMR 271 is performed. All new HVAC systems needs a Manual J for permitting. Any HVAC system that any duct or the air handler is outside of condition space will need a air leakage test for final inspection.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
  1. Needham Massachusetts Homepage

Contact Us

  1. Needham Town Hall
    1471 Highland Avenue
    Needham, MA 02492
    Phone: 781-455-7500

    Staff Directory

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow