Needham Massachusetts Homepage
Search
Do I need a Plot Plan as part of my building application?
Possibly. A Plot Plan is required if the proposed construction involves a new structure, an addition to an existing structure, a swimming pool or accessory structure over 15 feet in height or is placed on a permanent foundation. Five copies are required at permit submittal then three copies for a final As-Built completed by a MA registered surveyor and stamped.

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
  1. Needham Massachusetts Homepage

Contact Us

  1. Needham Town Hall
    1471 Highland Avenue
    Needham, MA 02492
    Phone: 781-455-7500

    Staff Directory

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow