I & I Projects

Previously Funded Areas
        
        FY08 - Engineering, Design & Construction  (Various Locations)         

                   Infiltration Construction - Area 2, 24 & 21(L)
        
           Area 22(Prelim. Design -  Infiltration)                            
                                                                                                
        FY09 and FY10  No funding requested

        FY11 - Area 16 and 22 Started                                                          

        FY12 - Area 16 - Area 22 - Construction (continuation)                         

        FY13 – Phase I  I/I Feasibility Study and Cost Benefit Analysis               

        FY 14 – Phase II  I/I Townwide System Master Plan                             

Proposed Funded Areas


        FY 15 – FY17 Area Determined by Study